Projects BMA/Moranbah Airport Platform Upgrades Client: BMA/Moranbah Airport As the owners of the Moranbah Airport, BMA recently performed an audit…[email protected]September 19, 2019
Projects Water Fill Point Upgrade Client: Peak Downs MineTasks Performed: Removal of original structure for repair and/or replacement DGH Engineering…[email protected]September 19, 2019
Projects Low Pressure Water Line Upgrade Client:Tasks Performed: Supply, fabricate and install a newly designed low-pressure water line DGH Engineering has…[email protected]September 1, 2019
Projects Tailing Pump Upgrade Client: Goonyella RiversideTasks Performed: Upgrade of Pumps & Pipework Tailings pump upgrade works completed civil…[email protected]December 17, 2015
Projects Rio Tinto Hail Creek Bulk Lube Farm Client: Rio Tinto Hail CreekTasks Performed: Supply, Fabricate & Install Principal Contractor for ProjectFabricated &…[email protected]December 17, 2015
Projects Peakdowns Prestrip Workshop Extension Client: BMA Peak DownsTasks Performed: Fabricate, Paint & Installation DGH Engineering Principal Contractor for ProjectResponsible…[email protected]December 17, 2015
Projects Marian Mill Boiler No.3 Client: Mackay Sugar LimitedTasks Performed: No. 3 Boiler Upgrade for Marian Mill Principal Contractor for…[email protected]December 17, 2015
Projects Mackay Harbour Molasses Facility Client: Mackay SugarTasks Performed: Supply, Fabricate & Installation of Molasses Pump Station - Mackay Harbour…[email protected]December 17, 2015
Projects Hay Point Tug Harbour Pile Strengthening Project Client North Queensland Bulk PortsTasks Performed Pile Strengthening & Corrosion Protection work Performed - Scaffold,…[email protected]December 17, 2015
Projects Assembly of 793 Truck Body Client: Minetec Australia Pty LtdTasks Performed: Haul Truck Bodies Fabricated, Blasted, Painted & Delivered to…[email protected]December 17, 2015