Platform Upgrades
Platform Upgrades
Platform Upgrades As the owners of the Moranbah Airport, BMA recently performed an audit which revealed some non-compliant platforms and access ways which are the pathways to inspect internal water...
Water Fill Point Upgrade
Water Fill Point Upgrade
Water Fill Point Upgrade DGH Engineering was recently tasked with a project for BHP Billiton at Peak Downs Mine which involved 3S & 4N Water Fill Points. The structure was...
Low Pressure Water Line Upgrade
Low Pressure Water Line Upgrade
Low Pressure Water Line Upgrade DGH Engineering has been awarded a project on a local coal mine to supply, fabricate and install a newly designed low-pressure water line from a...
Tailing Pump Upgrade
Tailing Pump Upgrade
Tailing Pump Upgrade Tailings pump upgrade works completed civil construction, installation of pumps & pipework. Done during shutdown No LTI’s...
Rio Tinto Hail Creek Bulk Lube Farm
Rio Tinto Hail Creek Bulk Lube Farm
Principal Contractor for Project Fabricated & supplied all Piping, Supports, Platforms, Stairs & Tanks Site Installation over a 8 week period including Managing Civil, Electrical, Hydraulics, Mechanical & Commissioning Installation – Project...
Peakdowns Prestrip Workshop Extension
Peakdowns Prestrip Workshop Extension
DGH Engineering Principal Contractor for Project Responsible for all Civils, Demolition, Electrical, Plumbing, Carpentry, Roof Sheeting, Mechanical, Hydraulics & Instrumentation for Project DGH Engineering Fabricated & Installed Portal Frames, Crane...
Marian Mill Boiler No.3
Marian Mill Boiler No.3
Principal Contractor for Project Responsible for removal of redundant steel pipes All Electrical, Logging & Civils Subcontractors Liased with suppliers for delivery of critical items Fabricated – Ducting, Structural Steel,...
Mackay Harbour Molasses Facility
Mackay Harbour Molasses Facility
Principal Contractor Supplied all Piping, Supports & Pump Bases Site Installation over 12 week period including Managing Civil, Electrical, Hydraulics & Mechanical On time and on budget No LTI’s...
Hay Point Tug Harbour Pile Strengthening Project
Hay Point Tug Harbour Pile Strengthening Project
work Performed – Scaffold, repair, Strengthen, Blast, Paint, Denso & Poly Wrap Wharf Pylons at Hay Point Tug Harbour Work completed on time and within budget No LTI’s...