100_0481.jpg Loading Rejects Bin 5.jpg 100_0478.jpg dbay2.jpg

Wednesday, February 08, 2012  | 

DGH_Logo_CMYK.jpg

   ISO4801.JPG

logo-ISO9001.jpg

  ISO14001.JPG

 �JAS-ANZ-JPG.jpg

 

 " A Wealth of Experience at your service"

          

 

Press Machine...

Brendan and press.jpg

 

15T Franna...

Franna on Weighbridge.jpg

 

Guilotine...

Guillotine.jpg

 

Forklifts...

loading with forklift.jpg

 

Punch Machine...

punch machine.jpg

 
Facilities & Abilities...
 

 

DGH Engineering operates from an Office and Workshop facility in a prime location at 4 Drake Drive, Paget, Mackay.  In order to support their growing number of site operations they have recently upgraded their office facility with the latest in computers, computer software and communication systems this combined with a 3000 square metre workshop which boasts :-

  • New State of the Art Welding Machines
  • Band Saw
  • 220T Press Brake
  • Guillotine - capable of cutting 12mm steel plate
  • Plate Rollers - capable of rolling 12mm x 3000mm steel plate
  • Radial Drill
  • Plasma Cutting Equipment
  • Pipe Benders
  • Punch and Shears
  • Oxy cutting equipment
  • 15 tonne ' Goliath' Overhead Crane
  • 3 tonne and 7 tonne Forklift

This allows DGH Engineering to turn out quality products, quickly.  Also with a vehicle fleet of ten - one tonne utilities and thier own semi trailer allows the transportation of freight and mobilisation of material, equipment and personnel to be done with minimal delay.

 

DGH Engineering has dedicated Blasting and Painting facilities on site. This facility enables DGH Engineering to complete the final product onsite saving client valuable time.  DGH Engineering is the only Workshop in Mackay able to process, fabricate blast and paint all under the one roof. 

 

DGH Engineering fabrication workshop operates 24 hours a day, 7 days a week if and when required to do so.

 

All managers are contactable 24 hours a day, 7 days a week.  The owners of DGH Engineering are responsible for selected areas of the business and pride themselves on ensuring all aspects of their role have been fulfilled.

 

At present the workshop has staff of 45 Boilermakers, 4 Fitters, 6 Riggers/Trades Assistants and 6 Apprentice Boilermakers.  The workshop has completed over 300,000 hours of work since starting operation in August 2005  and is proud of having no lost time injuries and the consistent high standard of work produced.

 

The majority of the workshop personnel hold mine generic inductions so as they can be utilised for mine site work when and if required. 

 

     
Copyright 2007 by DGH Engineering Privacy StatementTerms Of Use